Flood Tag

Renovations of the Administration and Carriage Buildings

[caption id="attachment_1746" align="aligncenter" width="300"] The Administration Building before Hurricane Irma. (Photo by Wade Sheldon.)[/caption] When life gives you lemons, make lemonade!  For the past few years, UGAMI has been implementing an infrastructure improvement plan.  Hurricane Irma was certainly a setback to those plans (see earlier posts...

Read More

Update on Hurricane Irma recovery

[caption id="attachment_1729" align="aligncenter" width="300"] Restoration nearly completed in the teaching lab (as of Feb 9, 2018). Electrical utilities were removed from the floor, the floor tiles have been replaced with an epoxy finish, and the bottom two-feet of the walls have been replaced, and the...

Read More

Hurricane Irma Hits UGAMI

Hurricane Irma hit UGAMI pretty hard.  About ¾ of our buildings had some storm surge flooding, including research & teaching labs; the BIRL dormitory; The Powerhouse (lecture hall/dining hall/kitchen); administrative offices; electrical, auto & carpentry shops; houses; and storage facilities. The main lab and nearby buildings...

Read More